|
Boys enjoy the last day of the office closet and linoleum floors
Date: 02/08/2009
Views: 26
|
Tracings of our family on the wall
Date: 02/08/2009
Views: 22
|
Before: office, hallway
Date: 02/09/2009
Views: 24
|
|
During: former office getting wrecked
Date: 02/09/2009
Views: 24
|
During: looking back toward laundry room
Date: 02/12/2009
Views: 25
|
During: looking up to the front of the house from laundry room
Date: 02/12/2009
Views: 23
|
|
Missing drywall
Date: 02/12/2009
Views: 25
|
Framing out new shower stall
Date: 02/12/2009
Views: 23
|
During: kids bathroom reduced in size with same old stuff
Date: 02/26/2009
Views: 24
|
|
During: new water heater filled in windows
Date: 02/26/2009
Views: 23
|
Patching up the walls in the boys bathroom
Date: 03/11/2009
Views: 28
|
New medicine cabinet, sink, faucet in the new bathroom
Date: 03/13/2009
Views: 24
|
|
The backyard is a disaster
Date: 03/13/2009
Views: 26
|
Testing out the new sink
Date: 03/13/2009
Views: 28
|
Testing out the new shower
Date: 03/13/2009
Views: 24
|
|
Wainscoting up but not painted
Date: 03/20/2009
Views: 23
|
Alec assembles new Elfa shelves into master closet
Date: 03/25/2009
Views: 27
|
New bedroom former office
Date: 03/28/2009
Views: 27
|