Flibbs.com

December 5, 2006

Demolition and remolition

Filed under: home — Heather @ 12:25 pm

Before — This is our kitchen all emptied out and waiting for the demolition:

Before the demo

During — This is what we came home to after Thanksgiving in NYC (from the same corner):

Destruction complete

The construction guys have made really good progress so far, but you’ll have to wait a little longer for “After” pictures. Everything is down and out, plumbing and electrical are in (inspections passed), walls up, mud/stucco is up, Alec primed the walls and ceiling, Alec started painting the ceiling, the dude is patching our wood floor as I type, and the cabinets should arrive today. Wheee.

In the meantime, we’re all scrunched up in the back of the house, enduring the official beginning of both the Terrible Twos and the Icky Third Trimester. Enjoy our photos of November fun.

0.198 seconds WP 1.5    xhtml css